The Central Campus Building, spanning two million square feet, serves as the centerpiece of Ford’s Research and Engineering campus in Dearborn, Michigan. This innovative facility will accommodate 6,400 employees from diverse disciplines, primarily focusing on design and product development.
Vapor Lock 20/20 will be incorporated in all slab on grade and elevated slabs to ensure the timely installation of flooring and prevent future moisture related flooring failure. Vapor Lock 20/20 is a concrete admixture designed to work with the free water and various components of the cement to create a non-hygroscopic concrete.