Mohawk Valley Health System – The Wynn Hospital
Vapor Lock 20/20 was selected for The Wynn Hospital project for Mohawk Valley Health System to prevent moisture related flooring failure and to ensure that flooring could be installed without …
Vapor Lock 20/20 was selected for The Wynn Hospital project for Mohawk Valley Health System to prevent moisture related flooring failure and to ensure that flooring could be installed without …
Vapor Lock 40/40 Corrosion Inhibiting & Waterproofing Concrete Admixture was selected for the new Marine Barracks at Camp Blaz in Guam to enhance longevity and safeguard critical infrastructure. This admixture …
Vapor Lock 20/20 enhanced concrete was chosen by the design team of the 89,693 square foot CREC Academy of Aerospace and Engineering Elementary School for its moisture mitigation, schedule integrity, …
The Houston Methodist Hospital North Tower Expansion construction team selected Vapor Lock 20/20 Concrete Admixture to proactively stop moisture, flooring, and roofing issues in this 22 story, one million square …
Vapor Lock20/21 Concrete Admixture was chosen by the San Diego Airport Authority Terminal 2 Parking Plaza design-build team as an integral solution for both shrinkage and corrosion protection in this …
Vapor Lock Enhanced Concrete was used by The University of Michigan Biological Science Building to eliminate any moisture concerns in the three tower, 300,000 square foot project in Ann Arbor, …
Vapor Lock Concrete Admixture has been included in 20 schools totaling over 3 million square feet with Wake County Public School System in North Carolina. Previously, The school district experienced …
Vapor Lock enhanced concrete was chosen by Populous Architects in the 41,500 seat, 1,100,000 square foot LEED Silver Certified Atlanta Braves Park. Vapor Lock 20/20, a superior water vapor reducing …
Vapor Lock 20/20 was chosen as a critical building material for the Exchange in the Greektown neighborhood of Detroit, which showcases the first North American application of the LIFTbuild approach …
Vapor Lock 20/20 was chosen by the Lawrence Memorial Hospital Construction Team to proactively stop moisture and flooring issues, and for the peace of mind that any moisture related flooring …
Designed by internationally-acclaimed architects Gensler, the glassy pavilion at Rash Field features a local cafe with sweeping views of the Baltimore waterfront. The pavilion also include an iconic steel shade …
Vapor Lock enhanced concrete was a key ingredient in this major expansion and renovation to the UNC Rex Healthcare Campus which included: a 17,000 square foot, two-story central energy plant …