Vapor Lock™ Concrete Admixture

Mohawk Valley Health System – The Wynn Hospital

Vapor Lock 20/20 was selected for The Wynn Hospital project for Mohawk Valley Health System to prevent moisture related flooring failure and to ensure that flooring could be installed without delay.

The Health System has consolidated two main inpatient campuses into a single, expansive facility. This new 678,000 square foot hospital accommodates 370 inpatient beds and is designed to manage 90,000 visits annually. It offers comprehensive healthcare services, including imaging and cardiology, surgical and intervention procedures, endoscopy, and a birthing center.

AEC Team

Architect: NBBJ Architects

Structural Engineer: Korda/Nemeth Engineering Inc

General Contractor: Gilbane Building Co.

Ready Mix Provider: Clemente Fane Concrete

Construction Manager: Hammes Healthcare

Concrete Contractor: D J Rossetti, Inc

Specialty Products Group

If you have any questions about the project or the products used in them, curious about other building applications, or want to discuss your next project, please contact us.